This is based on one of two docks at Two Harbors, Minnesota. You must add four
switches in surveyor using rail only track. This is a bit tricky but can be done.
Two go where the 2-track approach trestle makes the transition to the 4-track bin
section. When looking from shore towards the far end the other two form a single
crossover from the left track to right track on the 2-track approach trestle. A
double crossover is possible though not prototypical.
This is interactive to unload hoppers with iron ore (kuid2:30671:9260111:2) on top.
It is not interactive to load ore ships at the bottom.
This uses kuid2:36713:40100:2 for the lamp posts.
VERY IMPORTANT! This is a large and extreamly high poly count item.