Another bridge over the Chicago Sanitary and Ship Canal but as a non-symetrical span.
This allows wider clearence for traffic in the canal since the center support is not
in the water. This bruidgeprobably had the mechinism to open it installed and removed
around the same time frame as bridge 9C. This version is normally open and will close
at the approach of a train in 10 seconds.