This is somewhat of an unusual interactive mine and mill combination with smoke and sound
effects that is spread over a fair amount of mountain side. Ore comes in via an enclosed
conveyor, is crushed, sorted, and sent to the ore bin via a 24 inch gauge tram. The short
section of trestle to the right leads to the tailings pile. A pile of rock of a different
color then the ground texture should be placed at the end of this trestle. The bridge in the
trestle to the ore bin is for crossing a small creek or dry wash. Depending on how you run
the output track it could also require a bridge to cross the creek. The two 24 inch gauge
tracks DO NOT connect inside the mill. Some thought should be given to how you will arrange
the terraines elevation as this obviously is not designed to go on flat ground. As downloaded
this is set up for coal but the config and script files are arranged in such a way that changing
the product only requires changing the product kuid in 3 places in the config file. No changes
are necessary in the script file.