This small interactive coaling facility is roughly based on the Tintic Standard
Mining Companys facility in Dividend, Utah and takes coal in on 18 inch gauge track
(stopped unload) and loads std gauge hoppers at either of 2 chutes (stopped
load) with animation, smoke, and sound effects. The letterings text, color, and size
can be changed by manipulating the values in the effects section of the config files
mesh table. Many thanks to Dale Pattee of bsnteng inc. for the script file to make
it all work.
NOTE 1: It is a good idea to connect a short section of invisible track to the front
end of the 18 inch gauge track to prevent accidently over shooting the unload point
and crashing your route.
NOTE 2: Wider gauge track can be used up top if desired by change the kuid in the config
file in two places.