This is a small industry-interactive coal facility that takes coal in (stopped unload) from
std ga and 3 ft ga hoppers on dual gauge track and delivers it (stopped load) to std ga or 3 ft gauge loco
tenders on dual gauge track. This uses separate tracks for both gauges so you must attach both std ga and 3
ft ga tracks at both ends of both tracks. I suggest MAN2 standard gauge track and MAN2 narrow gauge track
which can then be connected to MAN2 dual gauge track. The chute is animated with smoke and sound.
WARNING! Do not attempt to connect MAN2 dual gauge track to this item. It will crash your computer to the
point the only thing you can do is turn it off and back on to clear it.