This is a new addition to my work car series. This is a pile driver set up in the operating position
as if it were driving a piling off the end of the track. This is animated with sound effects and has user changeable lettering (in the config.txt).
Surveyor will not allow you to place this car far enough toward the end of a track. This can be overcome by adding a short
section of invisible track at the end. This allows the hammer to be off the end of the visible track.