A single span 2 track through plate girder bridge under going heavy repair or replacement. A temporary trestle
(sometimes called a shoofly) has been erected to ease the bottleneck. Trains would cross under a slow order. Each opening in the
trestle is just wide enough for a 2 lane road or a double track main line. Both taken together have been positioned to allow a
four lane highway to pass underneath. I used kuid:47583:37120 (road4lanes) but others will work as well. This could be used to
make an interesting scene on a route since maintainence equipment exists on the DLS for either on track or off track repair.
For those who like operations, this offers a bit of difficulty in keeping to the schedual.