This coaling facility at Sargent, Colorado (about half way between Salida and Gunnison) is based on the original D&RGW plans dated
1/1/1909. Coal was probably delivered to this structure by 700 and 800 series drop bottom gons. While this is a narrow gauge structure, any gauge
track can be placed by the coal chutes, The common rail of dual gauge track should be next to the structure, KUID 35412:38061 (MB_NG_Track_3_rail_only)
is required for this item.