This is a dual railtrack bridge spline, based on the Beringstraat crossing.
The spans are 100 metres nominal length and the bridge places as a spline.
Updated as part of DLS Clean Up Program by PCAS1986.
Note that changes to the way bridges are created means that the original end (initiator and terminator) meshes had to be removed so that track connections are visable.