Polygons 7978 (high) & 3796 (low)
Size: 184,30 x 55,54 x 36,81 meter
Model is made as a Build 2.4 model for TRS2004 onward, but due to NV3 rules a build 2.8 is uploaded to the DLS... Same KUID as a 2.4 build should most likely end up at the TPR Depot.
Freelanced very large Custom mill made for Casey Brasel, which asked for a large Copper Mill to support 3000 tons a day. To be used with smaller 22 foot hopper ore cars of standard gauge type.
Model is based on two of my other mills - the Old Lucky Mill from the Northbay Route and Noname Mill 4, used three times each for length. Script help dates back to the Northbay project with great thanks to Mark Baldwin and Robert Pearson for all the help with the scripting to make it empty the railroad cars! The ore bins and the coal bin is operating, but might take some fine driving to empty into just like in the real world! Later version might also add some outputs too.
It has a standard (or dual) gauge connection to 30 bins (15 triggers) at the upper back level where the end bins has a capacity of 58070 liter while the 28 other bins has a capacity of 68277 liters.
In addition, there is a 2-foot narrow gauge connection to 10 more bins (5 triggers) where each of those bins has a capacity of 17572 liters.
Due to this being a reuse of the mill script for the Old Lucky Mill of the Northbay Route I had to make a average bin size in order to get the mill to take the correct amount of ore - are you a scripter feel free to help me out making this work more correct by adding support for the narrow gauge bins and so on, please!
Casey wanted a copper ore mill to support 3000 tons a day, not quite sure I have managed to fill that - but it uses about 29 hours to empty a 100% full mill - so if you feel I done something wrong, again, feel free to contact me and help me out make it more correct.
While this is an old model from 2005, I did spend time updating the textures on it, consolidating some of the materials so it went down from 12 to 8, but it was just to much work making it into two or possible three materials only so I did not do that.
I might do it in the future, as a update can always be issued later, same with support for extra industry working stuff, if you know Trainz script, feel free to help me out. :-)