This session is for PortOgden&Northern 1a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed, apart from the Rail4Chem MaK 2000 locomotive and the side dumping hopper wagons. These can be downloaded from:
http://rapidshare.com/files/115483027/Loco_MaK_G2000.zip
http://rapidshare.com/files/114963979/Polish_Hopper_SideDump_Complete.zip
Kurt and Steffen, Port Ogden Yard Master here.
The work crews up at the cutting at the top end of North Pass need some help.
Load up the side dump wagons at the ballast siding, the well wagons with box girders at the gantry at the Workshops, and load the flat wagons with rails and sleepers at the MoW store.
Unload them all in the cutting.
Proceed to Newcastle, and load the wells with two excavators and the flats with wheel sets at the south east end of the wharf.
Unload the excavators at the cutting, reload the dumpers at the Ballast Pit and return to Port Ogden. Unload the wheel sets at the Workshop gantry and leave the dumpers at the ballast siding.
Then contact me again.
You are authorised to travel at up to 50mph except in yard areas where normal limits apply.
You must give way to all other trains.
The session will take about 2h to complete.
Maps and other useful documentation can be downloaded from:
http://rapidshare.com/files/97388922/PortOgden_1_Documentation.zip