This session is for PortOgden&Northern 1a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed, apart from the Russian diesel locomotives, which can be downloaded from:
http://rapidshare.com/files/98340746/USSR_Loco_3unit_3TE10M.zip
VanDenH Yardmaster here. Chuck and Joe, two of the high-capacity freight cars have been loaded with excavators over in the east yard. Load the other two hicaps with those massive lead pipes at Fabulous Fabricators.
Head south through Tinkers with the four hicaps and down South Pass to Ogden. Unload the pipes at Hymill-Write, under the Demag gantry.
Take the excavators to the Conoco shale oil refinery at Chippewa East, and leave them there for unloading.
Collect the loaded log cars at Chippewa Logging and proceed to Port Ogden.
Unload the log flats at the log wharf.
Refuel your locomotives and contact the Dispatcher for your next duties.
You must give way to all trains at all squeeze points.
You are authorised to travel at up to 50mph except in yard areas where normal limits apply.
The session should take about 2 hours to complete.
Maps and documentation can be downloaded from:
http://rapidshare.com/files/97388922/PortOgden_1_Documentation.zip