This session is for RiversideRailroadCompany 1a. It uses Western European rolling stock. The log wagons will be downloaded from the Download Station when the session is installed; the MaK 2000 locomotive must be downloaded from
Note: Three yellow markers represent a LARS section of track; two ProtoLARS. Freight wagons will load or unload when stationary on a LARS section. If one wagon in the consist has been stationary on a ProtoLARS section for one minute, all freight wagons in the consist will load or unload in sequence. Right clicking on the section of track will show what it programmed to produce or consume.
Kurt und Steffen; the logging shift this morning.
Couple up to those log wagons, head north and load the last three wagons at Riverside and the remainder at the log loading table at Armour.
Unload the logs at the south side of the Dry Sort Yard at Diaspar.
Load all the wagons with lumber at Matchless Timber Products and return south to Lys.
Unload the lumber where the log wagons are at the moment, at the Timber Products Wharf.
Contact me for your next working.
Class 1 trains will be running. You must always give them priority at all squeeze points.
You are authorised to travel at up to 55mph except in yard areas where normal limits apply.
Maps and a readme are included in the folder containing the session.