This session is for RiversideRailroadCompany 1a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed.
Chuck, Joe, Dispatcher here. Welcome to your first day with our new Company.
You can treat this as an introductory tour, but remember our passengers are also depending on you to maintain schedule. You will be driving our new two unit Desiro railcar.
You start at the Minerals Loader, then pick up at Conoco, the Teamsters Yard, the Container Terminal and then to the Caboose Spur at Loco. Head north, stopping at Lys Harbor Station, Fingers Foundry and all stops to Diaspar. Terminate at Anderson Milling before stabling at the Diaspar bay platform.
Then report for further instructions.
Class 1 railroad trains will be running on the main line; you must always give them priority.
You are authorised to travel at up to 50mph except in yard areas where normal limits apply.
Maps and a readme are included in the folder containing the session.
This session can also be used as a template for other sessions. The AI trainz are configured to run southbound on the Riverside section, and all water standpipes and coaling facilities have been configured to produce water and coal to support steam locomotive operations.