Uploaded a second time.
This session is for PortSwitchingCo 1a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed, though Download Helper may not capture the loco crew, kuid 44090:57003, for the NSWGR 59 class steam locomotive and you may have to download this manually.
Note: Three yellow markers represent a LARS section of track; two ProtoLARS. Freight cars will load or unload when stationary on a LARS section. If one car in the consist has been stationary on a ProtoLARS section for one minute, all freight cars in the consist will load or unload in sequence. Right clicking on the section of track will show what it programmed to produce or consume.
Bruce and Barry, the track is spreading at the rail overhead crane down at the far end of the Teamsters Yard and there is a lot of over-spill on the track at the minerals loader.
Coal and water your 59 class locomotive, then load those two flat cars parked next to the workshop with sleepers and rails from our store behind the roundhouse.
Take the two loaded flats and the crane and shovel with match wagon from the guards van siding down to the lower level.
Unload the rails and sleepers and leave the crane to assist in rail replacement at the overhead crane.
Leave the shovel under the minerals gantry so that it can clear the tracks.
On your way back light engine, collect the crane and the two empty flats, and load those five flat cars standing at the timber products wharf with lumber.
Leave the crane and the two empty flat cars at the guards siding and leave the five flats loaded with lumber in the Transfer Yard.
Report for further instructions.
Always give way to the trains hauled by the new 44 class diesels on the upper level.
Maps and a readme are included in the folder containing the session.