This session is for PortSwitchingCo 1a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed.
Note: Three yellow markers represent a LARS section of track; two ProtoLARS. Freight cars will load or unload when stationary on a LARS section. If one car in the consist has been stationary on a ProtoLARS section for one minute, all freight cars in the consist will load or unload in sequence. Right clicking on the section of track will show what it programmed to produce or consume.
Hi Chuck, Joe, Dispatcher here. This little task will take about one hour on this cool and drizzling morning. First up refuel that GP60.
Then those yellow Armour reefers in the Transfer Yard are for loading at Frigid Coldstore (LARS). Down on the lower level the glacier green GN boxcars are for loading with auto engines at HeavyTech (ProtoLARS) and the tuscan red Berlingtons with auto components at Tyco Plastics (ProtoLARS).
Leave the loaded cars in the Transfer Yard and report to me for further instructions.
Take care at the three squeeze points on the upper level. The main line trains always have absolute priority.
Maps and a readme are included in the folder containing the session.