This session is for YardSwitchingCo 1a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed. You will be using a Class 37 to shunt steel carrying wagons. Watch, in particular, the animations of the JSA and out of gauge wagons.
Charlie and Tim, this is Train Control. Another morning shift. Refuel your Class 37 then head to the western transfer yard. There you will find bogie bolsters loaded with steel sheet, empty JSA steel carriers and that red German out of gauge steel plate carrier we have borrowed.
Take the bolsters and JSAs to the Hymill-Write factory. The steel carriers will load with steel coil when stationary between the triple yellow markers. Leave the JSAs there.
Unload the steel sheets from the bogie bolsters between the double yellow markers. The wagons will unload in sequence once they have been stationary for one minute with one wagon centred between the markers.
Take the empty bogie bolsters to the PerWay Depot and load them with rails. They will load between the yellow markers.
Return the loaded JSAs and the loaded bolsters to the transfer yard. Run round the red out of gauge wagon. Shunt it into Alans Multifunctional. It will load with plate steel after being stationary between the double yellow markers for one minute. Unload the pate between the triple markers at Hymill-Write.
Reload the wagon at Alans and make up the train ready for departure in the transfer yard. Contact me for further instructions.
Maps and a readme are included in the folder containing the session.