This version corrects Transformers 2 by using high capacity well cars that will load the transformers.
This session is for Urban IndustRail 8a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed.
Hi Chuck, I have a special shift for you and Joe this morning.
There are a couple of old transformers that have to come out of Sparks Power Station and taken to the heavy lift wharf at Dunedin on those high capacity well cars sitting in the yard.
The lifting equipment at Sparks is not adequate for the load, so you will need to take the 250t crane from the MoW Depot with you.
Position the crane on the track that is parallel to the track that is next to the loading platform at the triangle at Sparks, and use the crane to load the transformers.
Unload the transformers at Dunedin. The gantry crane will lift them off.
Leave the wells at Dunedin, but you will have to return the crane to MoW.
Class 1 railroad trains will be running at 5 minute intervals.
You are authorised to travel at up to 40mph except in yard areas where normal limits apply.
You are authorised to stop when necessary for locomotive purposes.
Contact me if needed.
Maps and a readme are included in the folder containing the session.