This session is for Urban IndustRail 8a. All items of rolling stock are on the Download Station and will be installed automatically when the session is downloaded.
The Sparks Electricity Corporation is strengthening the electricity supply system by installing additional transforms in the distribution network. You will be loading transformers at Invercargill Harbor and delivering them where required.
It is getting towards the end of your shift. You and Joe bought a roadside freight south from Picton earlier in the day and are servicing the locomotive at the Locomotive Depot. The return trip will be your final turn before signing off. The Depot Master has just handed you the Train Orders from the Dispatcher:
Finish loco servicing at Loco Depot.
Proceed light engine south to Invercargill Classification and attach flat cars.
Proceed south to Invercargill Harbor and load transformers at gantry crane.
Proceed north to Sparks Power Station and unload two transformers at triangle, west side of yard.
Proceed north to PhilSkene Heavy Industries and unload one transformer at large gantry crane.
Proceed north to Sydkrome Tools and unload one transformers in eastern spur, behind main tool factory.
Proceed north to Kar Kompany and unload two transformers at gantry crane.
Leave empty flat cars at Picton Classification and proceed light engine to Picton loco.
Sign off.
Class 1 railroad trains will be running at 5 minute intervals.
You are authorised to travel at up to 50mph except in yard areas where normal limits apply.
Ends.
Maps and a readme are included in the folder containing the session.