This session is for Urban IndustRail 8a. All items of rolling stock are on the Download Station and will be installed automatically when the session is downloaded.
The Kar Kompany needs an almost continuous stream of crates to package spare auto parts. You will be supplying the crate manufacturing company with selected low quality timber, taking the crates to Kar Kompany, and taking trailers loaded with crated spare parts to the Teamsters Yard at Dunedin.
You arrived at the timber wharf at Dunedin half an hour ago and have run round the log flat cars. A few moments ago the Yard Master came across with the Dispatchers revised Train Orders:
Load log flats, proceed south to Port Arthur Dry Sort Yard, unload logs at donkey engine on west side of yard.
Load log flats with sorted timber at east side of Dry Sort Yard.
Proceed north to Dunedin, stop in yard, check train and check for revised Train Orders.
Proceed north to Hyde, and leave log flats at Hyde Crate Manufacturing Company.
Attach flat cars and load with empty crates.
Unload crates at Kar Kompany, far north east corner, and leave flats.
Attach and load TOFC.
Proceed south to Dunedin, unload trailers and leave TOFC in Teamsters Yard.
Proceed light engine to Dunedin loco and sign off.
Class 1 railroad trains will be running at 5 minute intervals.
You are authorised to travel at up to 60mph with cab end leading, except in yard areas where normal limits apply.
With long end leading you are restricted to a maximum of 50mph.
Ends.