A steel truss lift span dual track rail bridge (fixed object). It has a span of 90 metres, is 8 metres between trusses, with concrete piers. The dual track spacing is 4 metre centres.
A spline of approach spans is available, but you need to join the spline to the main span with very short sections of single line track, so gaps are not created between the two.See the readme file.
The design is based on the Tenbridge crossing at Chattanooga, Tennessee, USA.
The bridge acts as a mocrossing and the span descends automatically as the train approaches the crossing. The model has navigation lights on the lift span.
Installs as Tenbridge Lift Bridge in the USA Scenery menu.