The Merivale rail bridge across the Brisbane River. This is a dual track bridge, track spacing 5 metres, and it places as one object, not a spline. While the original bridge is electrified, no overhead catenary has been included on the bridge, users should place their own to suit their operatng height.
A separate spline of the approach spans is available (kuid2:60238:38529:1). This may be joined to the main bridge using single track at the junction, I suggest you use the track type on the bridge, kuid:-1:100966, 4mstandard solid.