Baltimore & Ohio ordered 60 Q-1b class 2-8-2's in 1911 following the successful test of two E-27b 2-8-0's converted to 2-8-2's by Baldwin and the 150 Q-1's and Q-1a's subsequently ordered. The big difference is that the Q-1b's were delivered with superheaters, making them a bit heavier. Most received stokers later on. When they received outside steam pipes, a change made to 56 of the engines by 1924, they were reclassed Q-1ba. The Q-1b's were numbered 4150-4159 and 4170-4219. All were retired by 1956. Tender for Baldwin heavy shortline mike.
Coal: 12 tons
Water: 10000 gallons.
blw_hmike_ten_art |
|
blw_hmike_ten_art / blw_hmike_ten_art_icon.texture.txt |
87 B |
blw_hmike_ten_art / ebt_mike17_art_icon.bmp |
24.1 kB |
blw_hmike_ten_art / ebt_mike17_art_icon_a.bmp |
24.1 kB |
blw_hmike_ten_body |
|
blw_hmike_ten_body / 750tender.texture.txt |
32 B |
blw_hmike_ten_body / 750tender.tga |
3.0 MB |
blw_hmike_ten_body / blw_hmike_ten_body.im |
215.7 kB |
blw_hmike_ten_body / coal.bmp |
12.1 kB |
blw_hmike_ten_body / coal.texture.txt |
27 B |
blw_hmike_ten_body / copy of 750tender.tga |
4.0 MB |
blw_hmike_ten_body / copy of text.tga |
256.0 kB |
blw_hmike_ten_body / load.im |
7.8 kB |
blw_hmike_ten_body / load.kin |
1.3 kB |
blw_hmike_ten_body / shadow1.texture.txt |
49 B |
blw_hmike_ten_body / shadow1.tga |
256.0 kB |
blw_hmike_ten_body / text.texture.txt |
43 B |
blw_hmike_ten_body / text.tga |
192.0 kB |
steamtender.gs |
200 B |
Общий объём файлов: |
8.0 MB |