track alignment tool.
To use when laying lage amounts of track, available in 10-, 20-, 30-, 40- and 50-track.
-
How to use:
Place 2 of this assets at either end of the yard or station you want to build and align them by rotating it in the correct position.
Connect the desired tracks. You don't have to use all the tracks. Unused tracks can be made invisible by snapping a piece of invisible track on it, for instance kuid:-10:137.
When ready, delete the 2 tools and connect al the tracks in the usual way. You can use the 'Straighten Track'-tool to straighten the individual tracks when desired.
You can also let the tools in place, just replace the tooltexture with a suitable tga-file.