This session is for PortSwitchingCo 1a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed.
Note: Three yellow markers represent a LARS section of track; two ProtoLARS. Freight cars will load or unload when stationary on a LARS section. If one car in the consist has been stationary on a ProtoLARS section for one minute, all freight cars in the consist will load or unload in sequence.
Chuck, Joe - Dispatcher here.
Take those container flats down to the container wharf. Unload the 20 footers on the track next to the water; the 40 footers on the middle track (both ProtoLARS).
Take the empty flats to the container depot and load with tank containers (LARS).
Fill the tank containers at Conoco (they actually will not load).
Leave five of the flats in the transfer yard. Unload and leave one flat at Tyco Plastics (ProtoLARS).
Class 1 railroad trains will be running at 3 minute intervals. They have priority at all times.
Report to me when completed. It should take about 50 minutes.
Maps and a readme are included in the folder containing the session.
This is a revised version that corrects a serious glitch in the original.