This is Auran's standard *tunnel* double tracked tunnel but with the track spacing set to 5m between centres. This matches the standard Auran double track and looks better than the standard Auran tunnels (which are set at 4m...).
Powered by AKR © Камиль Ахметзянов aka kemal, 2011 - 2024