Trainz-mp Главная | Форум trainz-mp.ru | Обратная связь (Ваш вопрос, Создание пакетов) На наших часах: 20.04.2024 3:47:21

Здравствуйте Гость ( Войти через форум ) Авторизовавшись Вы сможете загружать сюда любые зависимости формата .CDP для игры Trainz Куиды Поиск

Репозиторий

<kuid2:169585:28218:2> SF HN workshop double size

Тип: scenery
Опубликовано: 30.01.2015 20:14:07
Скачиваний: 291
Размер: 145.6 kB

Скачать

Workshop, double size, for wagon repair and smithy work.
Ironstone was extracted and processed at Hook Norton from the mid-1870s until after World War II. It was part of the swathe of oolitic ironstone deposits that runs from north-east England to Devon in the south west. Three companies originally mined the ore in open-cast adits but by the early 20th century only that operated by the Brymbo steel works remained commercially viable. The raw ironstone contained about 44% iron ore in beds about 5 feet thick located near the surface. The adits were simply cut into the terrain at a slight angle, allowing the ironstone to be shovelled directly into hopper wagons. The ironstone had a relatively high water content and it was in order to remove this along with some of the impurities that it was cooked (calcined) on site before being transported to the Brymbo steel works in north Wales.
The plant comprised two or more kilns served by a gantry with elevators. Hoppers were pushed individually onto the elevators, taken to the top of the gantry and then moved to tipplers where they were rotated to dump the ironstone into the top of the kilns. The calcining process was gas fired. Coal (town) gas burners were located at three levels in the lower part of the kiln. Once the ironstone had been calcined the reduced ore was released through chutes into standard-gauge wagons. The coal gas was manufactured on site in a basic retort housed in a brick building. Prior to firing, gas was temporarily stored in a large tank and was fed to the kilns through large-diameter pipes. In addition, there were two large horizontal gas storage tanks. The plant also included one or two workshops for repairing wagons etc., and a locoshed for the narrow-gauge locomotives.


config.txt:

Файлы:
6 panes wide rounded window.texture.txt 50 B
6 panes wide rounded window.tga 48.0 kB
corrugated iron 2.texture.txt 40 B
corrugated iron 2.tga 96.0 kB
hn_workshop_double.im 155.8 kB
screenshot.jpg 30.5 kB
stone1.texture.txt 29 B
stone1.tga 48.0 kB
wood 1.texture.txt 29 B
wood 1.tga 12.0 kB
wood2.texture.txt 28 B
wood2.tga 6.0 kB
Общий объём файлов: 396.6 kB

Версии элемента:
kuid kind name build date size
<kuid2:169585:28218:2> scenery SF HN workshop double size 3.5 30.01.2015 20:14:07 145.6 kB

Зависимости:
kuid author kind name build date size
Нет

Зависимые элементы:
kuid author kind name build date size
<kuid2:283805:4015089:1> #283805 map Porthmadog-Blaneau Ffestiniog - TS12 3.6 24.07.2023 0:29:33 3.5 MB
<kuid:375451:100405> #375451 map Dragons Pass 1920s Steam Era 3.7 18.10.2021 19:30:24 12.5 MB
<kuid2:375451:100463:3> #375451 map Dragons Pass V4.7 3.7 23.01.2021 12:33:45 13.3 MB

Яндекс.Метрика


Powered by AKR © Камиль Ахметзянов aka kemal, 2011 - 2024